Loading THM…
THM • CIK 0001134115
Overview ITH is a company engaged in the acquisition and development of mineral properties. The Company currently holds a 100% interest in a development stage project in Alaska referred to as the “Livengood Gold Project” or the “Project”. The Company has not yet begun extraction of mineralization from the deposit or reached commercial production. As of December 31, 2025, the Livengood Gold Project has (i) proven and probable reserves of 430.1 million tonnes at an average grade of 0.65 g/tonne (9.0 million ounces) based on a gold price of $1,680 per ounce and (ii) measured and indicated mineral resources, exclusive of mineral reserves, of 274.51 million tonnes at an average grade of 0.52 g/tonne (4.62 million ounces) based on a gold price of $1,650 per ounce, in each case as reported in the TRS attached as Exhibit 96.1 to the 2022 Annual Report on Form 10-K/A filed with the SEC on October 17, 2023. A more complete description of the Livengood Gold Project, including detailed presentation of resources and reserves, is set forth in Part I, Item 2. Properties of this Annual Report on Form 10-K. The head office and principal executive address of ITH is located at 200 Burrard Street, Suite 1570, Vancouver, British Columbia, Canada V6C 3L6, and its registered and records office is located at 745 Thurlow Street, Suite 2400, Vancouver, British Columbia, Canada V6E 0C5. Livengood Gold Project Developments On January 27, 2026, the Company completed a public offering of 33,672,000 common shares, at an issue price to the public of $2.22 per share, for aggregate gross proceeds, before deducting underwriting discounts and offering expenses, of approximately $74.8 million. Concurrent with the public offering, the Company completed a private placement of 19,520,000 common shares to affiliates of Paulson & Co. Inc. (“Paulson”), at the same issue price, for aggregate proceeds of approximately $43.3 million. The private placement was completed in two tranches, with 18,018,018 issued to Paulson on January 27, 2026 and an additional 1,501,982 common shares issued to Paulson on January 29, 2026 to reflect an upsizing in the size of the $60 million public offering initially announced by the Company on January 22, 2026. Livengood Gold Project Technical Report Summary The TRS details a project that would process 65,000 tons per day and produce 6.4 million ounces of gold over 21 years from a gold reserve estimated at 9.0 million ounces at 0.65 g/t. The TRS utilized a third-party review by Whittle Consulting and BBA Inc. to integrate new interpretations based on an expanded geological database, improved geological modelling, new resource estimation methodology, an optimized mine plan and production schedule, additional detailed metallurgical work at various gold grades and grind sizes, changes in the target grind for the mill, new engineering estimates, and updated cost inputs, all of which significantly de-risk the Project. The TRS has estimated the capital costs of the Project at $1.93 billion, the total cost per ton milled at $13.12, the all-in sustaining costs at $1,171 per ounce, and net present value (5%) at $1,800/oz of $400 million. The Project configuration evaluated in the TRS is a conventional, owner-operated surface mine that would utilize large-scale mining equipment in a blast/load/haul operation. Mill feed would be processed in a 65,000 tons per day comminution circuit consisting of primary and secondary crushing, wet grinding in a single semi-autogenous (“SAG”) mill and single ball mill followed by a gravity gold circuit and a conventional carbon in leach (“CIL”) circuit. 6 Table of Contents Whittle Enterprise Optimization Prior to beginning the Pre-feasibility Study (“PFS”) for the Livengood Gold Project that is summarized in the TRS, the Company retained Whittle Engineering and BBA Inc. to collaborate on an enterprise optimization study (the “Whittle and BBA Study”) to review various technologies and project configurations and to recommend the optimum configuration for the PFS. The Whittle and BBA Study reviewed secondary crushing with SAG and ball mill, tertiary crushing with ball mill, gravity/CIL at p80 of 90 micron to 250 micron, stand-alone and auxiliary heap leach configurations, gravity only gold recovery, gravity/flotation with pressure oxidation and CIL of flotation concentrate.…
From recent Form 4 filings
Directors who filed Form 4s in the last 2 years (not a full DEF 14A board roster)